UOW
Excellence - Innovation - Diversity
University of Wollongong
Site Search
Advanced Search  
Policy Directory
Skip navigation
UOW Policy Documents
Policy Documents at a Glance
Writing & Reviewing Policy
 
 
 

    CONTINUOUS IMPROVEMENT POLICY

Date approved:

12 September 1994

Date Policy will take effect

On approval

Date of Next Review

Currently under review (2009)

Approved by:

Administrative Committee

Custodian title & e-mail address:

Quality Assurance Manager
quality_assurance@uow.edu.au

Author:

 

Responsible Faculty/Division & Unit:

Quality Assurance Unit

Supporting documents, procedures & forms of this policy:

 

References & Legislation:

 

Audience:

Public – accessible to anyone

Expiry date of Policy:

Not applicable

  • Contents

    1 Purpose of Policy

  • 1. Improvement in the quality of services and activities within the higher education sector is a key government priority. As part of the response to this, the University is developing a strategy by which the quality of support services may be improved.
  • 2. This policy aims to encourage and support a philosophy of continuous improvement in participating units. It is the premise of this approach that all jobs, work processes and systems are capable of endless improvement.
  • 3. This policy will support the necessary changes in working practices to better serve the needs of clients of the University and to remove impediments to service improvement.
  • 4. Continuous improvement activities will compliment major initiatives resulting from introduction of new technology, the elimination of major problems and other significant changes.
  • 5. The primary focus of continuous improvement is on the prevention of errors before they occur, rather than their correction afterwards. The examination of tasks and work processes with the aim of the elimination of error, waste and inconsistency is critical. Every step in a process is examined, so as to achieve maximum productivity and client satisfaction.
  • 6. Pivotal concepts for the implementation of continuous improvement include:
    • Prevention of errors rather than correction
    • Identification elimination of waste
    • Identifying the need to improve inputs
    • Focus on improvement at every step in the process
    • Productivity improvement as a result of quality improvement
    • Understanding of variation and inconsistency
    • Importance of small step improvements
    • Involvement of all staff
    • Empowerment of staff and employee participation
    • Importance of measurement

    2 Definitions

Word/Term

Definition (with examples if required)

Continuous improvement

The progressive step by step improvement of every aspect of work. Steps may often be small, achieving impact by the sheer weight of accumulation. To qualify, improvements must be cost efficient or cost neutral and any improvement should not transfer work to another area. The major focus of continuous improvement is to improve quality.

Quality

Does not mean perfection or some unattainable goal, it means conformance with the expected standard where this standard is based on client expectations and requirements.

Clients

students, academic units, other staff, the community and government.

   

    3 Application & Scope

  • 1. The primary aim is to improve:
      • a. quality of service;
      • b. service delivery times; and
      • c. cost efficiency
  • 2. Services must also become increasingly consistent, constant and predictable.
  • 3. Quality improvement should improve job satisfaction through the removal of tedious checking and error correction. This should also create efficiencies and allow opportunities for job enrichment.
  • 4. The process of continuous improvement aims to involve staff at all levels and provide staff with an ‘ownership’ of the activity, whether this be at an operational, supervisory or managerial level.
  • 5. This policy will apply to staff in the units listed in Attachment A.
  • 6. The policy applies to staff at all levels.
  • 7. It is intended to progressively seek the extension of this policy to other units within the University.
  • 8. Additional limits may be added to Attachment A on request and by approval of the Vice Principal (Administration) as Chair of the Steering Committee.

    4 Procedures

  • 1. The University will create and maintain a ‘Continuous Improvement Management Plan’ for implementing continuous improvement. The plan will be updated on an annual basis.
  • 2. The plan will include firm targets and be based on process measurement and client feedback systems.
  • 3. All staff will be progressively and continually trained in areas relevant to continuous improvement. Such areas will include measurement techniques, group problem solving and client service procedures.
  • 4. New staff will be trained in continuous improvement and client service methods and procedures.
  • 5. There will be a Steering Committee, which will meet on a monthly basis. The Steering Committee will be chaired by the Vice-Principal (Administration), with the Director, Personnel Services as the Deputy Chair. The membership of the Committee will be the Heads of the Units scheduled in Attachment A.
  • 6. The role of the Steering Committee will be to:
      • a. commit resources to the project and guarantee continual support;
      • b. represent the views of their respective sections,
      • c. assist in facilitating the conduct of particular strategies,
      • d. serve as a sounding board for special project proposals,
      • e. suggest tasks and strategies,
      • f. maintain progress and provide feedback to their sections.
  • 7. There will also be an Advisory Committee. It will meet at minimum intervals of 2 months. The Committee will be chaired by the Manager, Personnel Services with the Coordinator of the project as the Deputy Chair. The membership of the Committee will be as determined from time to time but will include representatives of those academic units with expertise in relevant activities. The role of the Committee will be to:
      • a. provide technical expertise and comment on particular strategies and tasks;
      • b. give advice on suitable techniques, providers and tools; and
      • c. suggest additional strategies and tasks.
  • 8. The Vice-Principal (Administration) will allocate appropriate members of staff to implement the management plan. Initially, the plan will be supported by a full-time Coordinator and a part-time Administrative Assistant. The general direction of the plan will be the responsibility of the Manager, Personnel Services. The Coordinator of the project will implement the continuous improvement plan and associated strategies, and ensure staff meet objectives within deadlines.
  • 9. The management plan will establish and maintain strategies in, at least, the following areas:
    • training
    • client feedback
    • process measurement
    • improvement of systems
    • benchmarking
  • 10. At the end of each planning period, a progress report will be prepared summarising achievements, problems and issues.

    5 Roles & Responsibilities

  • 1. The implementation of this policy is supported by the Senior Executive of the University. Individual projects and strategies will be supported and encouraged. Where necessary, resources will be provided to advance well documented and researched projects which identity methods for improving the quality of service.
  • 2. Heads of Units will allocate staff time and resources to support implementation of this policy as a matter of priority.
  • 3. Where requested by affected staff member(s), staff representatives of their choice will be consulted on initiatives and strategies where appropriate.
  • 4. Staff involvement will occur at all levels. Staff at operational levels will be involved directly through the identification of problems and methods of improvement, as well as the implementation of the improved strategies. Supervisory staff will be required to not only participate, but encourage greater empowerment.
  • 5. Service Improvement Groups (SIGS) will be created to address areas of agreed concern. They will operate under rules set down by the University from time to time. All staff will be invited to participate in these Service Improvement Groups.

    6 Version Control and Change History

Version Control

Date Effective

Approved By

Amendment

1

12 September 1994

Administrative Committee

New Policy

2

6 May 2009

Vice Principal (Administration)

Migrated to UOW Policy Template as per Policy Directory Refresh

    Attachment A: Schedule of Units covered

  • As at 1 February, 1994
    • Academic Services Division
    • Administration including EEO and Internal Audit
    • Buildings and Grounds Division (office staff only)
    • Financial Services Division
    • International Office
    • Personnel Services Division
 
   

Last reviewed: 14 May, 2009 

 
   
 
University of Wollongong
Wollongong NSW 2522 Australia
UOW Switchboard: +61 2 4221 3555
Future Student Enquiries
Australia: 1300 367 869
International:  +61 2 4221 3218  

CRICOS Provider No: 00102E
Privacy, Disclaimer & Copyright Info
Feedback: webmasters@uow.edu.au